Sunday, November 18, 2012

Framing, sheathing, and plywood done.

I've done as much as I can on the outside.  I'm gonna hire out the roof, garage and french door installation, along with the siding.  I just want the exterior done, so I can start putting my tools on the inside.  

Sunday, November 11, 2012

The plywood roof is down and the sheathing is on.


The plywood roof is down and the sheathing is on the sides.  Tomorrow is adding the gable and dormer and wrapping it in tyvek.