I've done as much as I can on the outside. I'm gonna hire out the roof, garage and french door installation, along with the siding. I just want the exterior done, so I can start putting my tools on the inside.
Sunday, November 18, 2012
Framing, sheathing, and plywood done.
Labels:
Garage,
Renovations
Location:
Petworth, Washington, DC
Sunday, November 11, 2012
The plywood roof is down and the sheathing is on.
The plywood roof is down and the sheathing is on the sides. Tomorrow is adding the gable and dormer and wrapping it in tyvek.
Labels:
Garage,
Renovations
Location:
Petworth, Washington, DC
Sunday, October 21, 2012
Rafters and blocking done. OSB next.
All the rafter are up. The blocking is done. I'm ready to install the OSB for the walls and then the roof.
Labels:
Garage,
Renovations
Location:
Petworth, Washington, DC
Sunday, October 14, 2012
Garage Rafters
Labels:
Garage,
Renovations
Location:
Petworth, Washington, DC
Saturday, October 13, 2012
Wall Framing up
Labels:
Garage,
Renovations
Location:
Petworth, Washington, DC
Thursday, October 04, 2012
Wall Framing Done.
The rain this morning delayed my start, but I was able to finish framing all of the walls, along with the headers for the garage and french door.
Now I just need a couple of friends to help me raise the walls and put up the rafters.
Now I just need a couple of friends to help me raise the walls and put up the rafters.
Labels:
Garage,
Renovations
Location:
Petworth, Washington DC
Wednesday, October 03, 2012
Lumber has arrived!
All the wood arrived today, so I started framing. The hardest part was setting the sill plate and finding where to drill the holes for the already installed j-bolts. I was able to finish framing one of the walls.
Labels:
Garage,
Renovations
Location:
Petworth, Washington DC
Subscribe to:
Posts (Atom)