Sunday, March 24, 2013

Drywall is up.

All of the drywall is up and the mud is drying. Just a quick sanding and it'll be ready for paint.

Friday, January 11, 2013

The exterior is just about complete.



The exterior is just about done.  Only the finishing touches are needed.  Now I get to start on the inside.


Sunday, November 18, 2012

Framing, sheathing, and plywood done.

I've done as much as I can on the outside.  I'm gonna hire out the roof, garage and french door installation, along with the siding.  I just want the exterior done, so I can start putting my tools on the inside.  

Sunday, November 11, 2012

The plywood roof is down and the sheathing is on.


The plywood roof is down and the sheathing is on the sides.  Tomorrow is adding the gable and dormer and wrapping it in tyvek.  

Sunday, October 21, 2012

Rafters and blocking done. OSB next.

All the rafter are up. The blocking is done. I'm ready to install the OSB for the walls and then the roof.

Sunday, October 14, 2012

Garage Rafters


We only need to put up 3 more rafters, and then the OSB can start going on.  

Saturday, October 13, 2012

Wall Framing up


Wall framing up.  Ceiling rafters and roofing next.